There are 2 bridges needed for phase 1 RDS. The first bridge is at the entrance and will expand 12 meters. The second is 500 meters in the property and will expand 6 meters. The engineering and design plans for these bridges have been completed and approved. Bridge construction will begin as our roads advance and when the weather permits. In the meantime the property is still drivable without the bridges.