Now most of the planned areas of road work in Phase 1 have been cut. We are now in the process of widening the roads and installing concrete water drainage pipes.
Mitigation (protection of soil from erosion) has started. By using these green, perforated blanket-type cloths and by planting grass seed, the soil beneath has very little chance (in the near future) of eroding and will not once the grass really takes hold. The roads are looking great and we can drive our vehicles over most of the Phase.
Thursday, September 10, 2009