The Pacific
Blue water tanks are under construction this first tank will supply
potable water for 20 homes. The 2nd
and 3rd tanks once constructed will be
connected to this tank for equal pressure throughout the Development. Water
pressure will be maintained by 3 constant pressure pumping systems. The water
will be filtered using 3 stages of Micro Filtration, Chlorine Free water well system and sanitized with
UV at each Tank.
FYI: The CL Free water well system will eliminate the
Calcium problems associated with the hard water found in our area of Tambor. The Minerals used in
the system will have a
service life of 10,000,000 US gallons. There is NO salt used in the system. The
backwash water will be directed towards irrigation of plants in the area of
each water tank.
Supply water is provided to the 3 tanks from 2 different
wells in the Development. We anticipate that Tank #1 will be in operation by
the end of May. The first homes to be connected to the system will be PB16 and
PB 13. We will also be installing Water shut off valves and water meters on each
home-site.